Monday, November 30, 2009
On the Road
Thursday, March 26, 2009
LumberJackin'
The maple was tricky because it was leaning the opposite direction I wanted to bring it down in. So to bring it over safely I put I line on it, up about 12 feet from where I would place the cut and ran the line over to a come-along. We cranked up the tension and I placed my wedge cut. I had my bother crank the eveah-lovin’-crap out of the come-along to really get the tree bending. Then as I placed the backside felling cut the line would slack just enough for him to get one or two more cranks in. The maple went down perfectly and the top landed about 2 inches from my brother.
Sunday morning we went back out and limbed up the trees. Segregated the wood into three piles. Pile 1-Brushy crap. This I will stack off in the woods and let dry out. In the fall Ill come back into it and break it up to use as kindling. Pile 2-small diameter limbs. Pile 3-larger diameters trunks. The limbs and trunks
The pic is a before and after of the area. It doesn’t’ show the maple and isn’t as dramatic if the trees had leaves. Regardless it will be some good firewood and I just reduced my leaf raking about 3 hours.
Thursday, January 29, 2009
Art Thursday
As always everything is for sale, or if you need some custom work just let me or Steve know and we'll get back to you.
Tuesday, July 15, 2008
NOW! NOW! Yesterday!
Today was one of the craziest days at work ever.
Twice today the next phone call came within the same second of hanging up the last call. Field person #1 called in to tell me they uncovered a 'mystery tank'. (An underground storage tank that for some reason nobody seemed to realize was there). So that set of a flurry of phone calls.
A sub- called in to tell me that the code enf. officer of the town need 'something in writing' by the end of the day or the client would not get to open their store. Sweet, thanks for the heads up and the specificity.5 phone calls, with two messages to that guy. He called me back at 4pm. Ya know, cause i have no where else to be.
The client called me like 8 times today because he was getting worried the store wouldn't open. The sub called me back and I, well I spoke forcefully to him. I'm done with his shit. Worst communicator ever.
- Field person #2 calls. "Joe. there are bees in the well."
- Wife calls" Joe what do you think about the color of the britax car seat. tan or brown."
Simultaneously at 3pm the lawyer guy called me, "Hi. those copies you sent are too light. can you get me other versions?" "What's the time line?" I ask. "Yeah, thats the thing, we need them by the end of the business day today" AYFKM!
So yup. I am a miracle worker. I managed to get copies of the year old invoices faxed to me. The woman had apparently put them in the trash yesterday and fished them out to fax them. *PHEW!* I then met lawyer man on the street and handed him the paper work covert spy style under a shady tree.
All of this pushed aside my task list today of: a late report, a 20,000$ invoice and 4 reimbursement requests worth about 12,000$.
Wednesday, July 09, 2008
Trials, Tribulations and Other Good Things
On Monday after I got home from work Dad and I started laying down the hardwood floor (pic right) in the Baby to Be room. Luckily at work
Tuesday I drove the usual 1 hour to the office followed by 2+ hours to job site to work for 6 hours in 90 deg. hazy, hot and humid heat and run around in a dry dusty containment area. However, I did get to see a really cool steel cutter attached to an excavator. The contractor was in the last stage of tearing down the
I then drove back to the office stopping off at another job site to stick my head down a storm catch basin and squeeze petroleum out of a saturated
Driving back from the first job site I did get a good picture of some nice gneiss. It was in a road cut and I didn't have time to get great pic. or any scale in there but the rock face is about
Finally, on my way home I tried to pick up lobsters for dinner but all the places were closed. Fuckin' figures.
I arrived home at about 7pm and I then learned that my sink is HELLA clogged. For the next 2 hours we (me and dad) tried to clear the lines. We both got fuckin' hosed with nasty ass, rank sewer water. I thought we got the lines cleared but no....pretty much made it worse. Ill try again tonight.
Friday, June 06, 2008
Day 5
Last day of diggin'
Shortly after this the 20 year old CASE excavator blew a valve so the guys had to go get the other one. It slowed things down a little bit, but we managed to finish the excavation and even put a good dent in the backfilling before the end of the day Friday.
The only thing to do after this was drive the 3 hours home.
Wednesday, June 04, 2008
Monday, June 02, 2008
Day 1 part deux
Workin' day 1 part 2. Soil removal.
**now that Im back home I can write something about this. The job was to remove the upper 12 feet of 'clean' soil cover to get to the petroleum impacte soil. Which it self was about 12 feet thick.
The excavation depth was about 15 feet deep at this location measured from the ground surface at the monitoring well in the foreground.
Wednesday, July 18, 2007
A Good Load
Wednesday, June 20, 2007
Tuesday crazy-ness
At work, I was the fucking man. Keeping two people coordinated on-site at underground storage tank removals. " Yes, do this. No, now do that. What are your results? This is what we need for samples. Ok good. Did you talk to the State guy? Is he happy?"
Then I had a project meeting to lay out the next few months. Which was continuously interrupted by then aforementioned on-site jobs.
At noon Wife showed up for lunch. We had sushi. It was good
So, in that meeting with ClientGuy and BossMan I was able to steer the meeting because I had kept in recent contact with all the other parties involved *(State DEP, ClientLady in Canada and Monkey Subcontractors).
I got the feeling that BossMan was impressed and happy with what I had done.
Then just as Im going home...SmartWorkLady asks me to drop off lab samples on my way home. No Problem.
Then I get home and I rode the Kona into town to return the movie and because I was all pumped up I made it, the 5 miles into town in 16.4 mintues and return in 21 minutes. For an avg. spped of like 17.6 or something. Which is friggin' flying for this bike.
Wednesday, May 23, 2007
Cheap Bike Rack
The set up has effectively converted my little car into a mini-truck. I love it.
Friday, May 04, 2007
Useless Commuting Statistics
48 mins - 58 seconds.
14.26 miles
17.4 avg speed.
27.5 max.




