Monday, June 02, 2008

Day 1 part deux

Workin' day 1 part 2. Soil removal.

**now that Im back home I can write something about this. The job was to remove the upper 12 feet of 'clean' soil cover to get to the petroleum impacte soil. Which it self was about 12 feet thick.

The excavation depth was about 15 feet deep at this location measured from the ground surface at the monitoring well in the foreground.