Today is the 4th of July, 2011. It is the 9th anniversary of marriage to my wife. Melinda. Happy anniversary Woman.
Today she gave me a gift. A gift of alone time. I worked on a patio I am building for her today. Today was the 4th session of excavation. During the 1st session I removed the existing gravel and flat stone. I used that material and made this:
Then there were two more session of additional soil removal. Today was the fourth and final. I have move a total of approximately 17 yards of gravel, rocks, and till and now have a perfect hole to backfill with stone, sand and and the concrete patio blocks. The following pic is the end of the 4th excavation session/. 7 hours today. 22 hours total. 10 tractor hours.
This hole is level to 24 inches depth (+_3inches) from the pavement on the left, all the way to the right. The bottom is hand tamped (compacted). It is about 200 sqft. 2 feet deep. There was a lot of hand shovel digging. Hard, but I got my man hands back.
This fucking shit will not frost heave when I am done. Effort in equals favorable results out.
Excuse my derivation from good formatting, I am too damn tired to care. It is beer O'clock
Oh yeah right. i haven't posted in a while...I got a tractor. Its frigging aWEsoMMMMe.
I want a tractor.....:(
ReplyDeleteThat's awesome. A tractor, a new patio that will not frost heave. You are the man! How is the patio shaping up now, a month later?
ReplyDeleteits just about done. i have to cut some edge blocks. Ive got a post waintg in the wings for the big reveAl
ReplyDeleteWicked!
ReplyDelete